Chatham Lab Grown

Blue Sapphire Pendant – Flame, 14K White Gold, 10x6mm, 0.14 ctw diamonds

SKU: CP5146WBS

Chatham Price: $1,852.00
Shipping & Insurance: $25.00

FREE holiday shipping through December 18 on in-stock items shipped in the U.S.

Note: Jewelry enlarged to highlight craftsmanship & detail. Actual size of stone detailed below. 

Every order comes with one complimentary branded gift box and  Certificate of Authenticity.

  • 30-Day Free Returns
  • Plants a Tree
  • Lifetime Warranty
  • Responsibly Crafted

Description & Details
Style Number: CP5146WBS
Metal: 14K White Gold Pendant
Gemstone: 10x6mm Flame Chatham Lab Grown Blue Sapphire
Lab-Grown Diamond Total Weight: 0.14 ctw
Stone: Chatham Lab Grown Blue Sapphire
Center Carat Weight: 1.66 cts
Cost Price: 9200
Collection: Color Fashion Collection
Lifetime Warranty

Since 1938, Chatham has stood for quality, reliability, and integrity. Our commitment to excellence ensures that each gemstone meets the highest standards of quality and craftsmanship before they reach your hands. That is why we stand behind our lab grown gemstones through our lifetime warranty.

Plant a Tree

For every purchase made, Chatham plants a tree on your behalf. Chatham is dedicated to replenishing the earth’s resources and mitigating the environmental impact of the jewelry industry. Your purchase with Chatham takes a significant step toward a greener planet. Trees are a source of oxygen, they provide habitats for wildlife, prevent soil erosion, and contribute to the overall health of our planet. Find the One Tree Planet logo on your Certificate of Authenticity.

BRILLIANTLY CREATED.™
NEVER MINED.®


Frequently Asked Questions

Are lab-grown gemstones real?

Yes. Chatham lab-grown gemstones are grown in a laboratory using advanced scientific methods that replicate how gems form in nature. They have the same chemical composition, crystal structure, hardness, and optical properties as their mined counterparts. The only difference is origin: mined gems form underground versus lab-grown gems form aboveground.

How are Chatham gemstones grown?

Today, Chatham uses multiple advanced growth methods, including hydrothermal, flux, and a range of proprietary processes. These techniques are designed to closely replicate the natural geological conditions under which gemstones form. Growth occurs over a period of about 12 months resulting in exceptional quality gemstones.

Unlike faster mass-production growth methods that produce stones in a fraction of the time, Chatham's extended growth process prioritizes crystal integrity, depth of color, and natural formation characteristics. As a result, Chatham lab-grown gemstones develop more fully, much like it would in nature.

Why is Chatham the leader in lab-grown gemstones?

Chatham pioneered gemstone growth decades before lab-grown jewelry became mainstream. Today, Chatham remains the leader in lab-grown gemstones through an uncompromising commitment to quality, craftsmanship, and color mastery. We sacrifice nearly 80% of the original rough during cutting to reveal only the finest material. This ensures exceptional color saturation, clarity, and brilliance in every gemstone.

Combined with the industry's most extensive assortment of lab-grown gemstone colors—surpassing any other grower in range, consistency, and beauty—Chatham continues to set the benchmark for premium lab-grown color gemstones.

Does Chatham offer a warranty?

Yes, Chatham provides a lifetime guarantee on all lab-grown colored gemstones. Customers can trust that Chatham's lab-grown gems will retain their color and crystal structure permanently under normal wear. However, if your Chatham lab-grown color gemstone should chip or break under normal circumstances, Chatham will repair or replace it at no charge to the customer.

Chatham's commitment to quality through its lifetime warranty ensures peace of mind, trusted value, and reassurance that the gemstone marking the most meaningful moments will remain as vibrant and significant as the day it was chosen.

What is Chatham's return policy?

Chatham offers 30-day returns for jewelry. Items must be returned in original, unworn condition and free from any damage, alteration, sizing, repair work, or signs of use.

Please contact us at sales@chatham.com to receive a return authorization number to put on the outside of the return package. All returns are subject to review before approval. Shipping fees not included.

New Arrivals

Join the trendsetters of modern luxury with Chatham's newest line of lab-grown jewelry. Discover new designs including fresh twists on popular styles such as huggies, cluster jewelry, stackable rings and more.

shop collection

Connect with a Jeweler

Locate an authorized Chatham jeweler near you or book an appointment and we will connect you personally with a local jeweler.